Private Industrial Development

TX ProChem delivered soil stabilization solutions that ensured a strong foundation and on-time
completion for this private industrial development.

PROJECT OVERVIEW

For this development in, TX ProChem was contracted to stabilize the existing
expansive clay soils prior to foundation construction of a liquid asphalt plant and connected railyard.
The project required a fast-track approach while meeting strict engineering specifications and
maintaining the overall construction schedule.

Industrial Development

Property Type

431,000 Sq. Ft.

Sq. Ft. Published

Expansive Clay

Soil Type

Chemical Stabilization

Stabilization Method

85 Days

Completion Time

Passed All Density & PVR Tests

Quality Assurance

July 2026

Project Completion

PROJECT SERVICES

  • Soil Stabilization
  • Documentation
  • QA Testing (by GeoTechnical Engineer)

PROJECT CHALLENGES

  • Soil Stabilization
  • Documentation
  • QA Testing (by GeoTechnical Engineer)

OUR SOLUTION

TX ProChem implemented a comprehensive soil stabilization program using ionic chemical
stabilization technology.
Our team executed the work efficiently with strict quality control and testing at every stage.

Work Included:

  • Ionic chemical injected into existing soils to improve load bearing capacity and reduce heave
    and shrink
  • Density testing by GeoTechnical engineer to ensure all rail authority requirements were met,
    including but not limited to Density and Potential Vertical Rise (PVR) measures.